All Projects
Highway & DOT Case Study
I-74 Winston Salem Northern Beltway at US 52
Winston Salem, NC
Blythe Construction

Materials
Polyurea & Thermo
Quality Audit
100% Passed
Segment
Section EB
Cure Time
<15 min
The Challenge
Providing complete marking services on a major highway beltway segment with a combination of new asphalt pavements and concrete bridge decks requiring distinct material properties for optimal adhesion.
TMI Solution
TMI formulated a dual-material strategy, applying hot-extruded thermoplastic for the asphalt roadways and advanced plural-component polyurea for the concrete bridge segments, securing high-performance bonds on all surfaces.
Polyurea Coatings
Thermoplastic Markings
Highway Striping
Bridge Deck Marking
Project Outcome
Successfully completed the project in 2025, providing the beltway with high-durability markings that meet all NCDOT safety guidelines and exhibit superior retroreflectivity values.
Deployment Radius
TMI Services provides mobile deployment for high-scale projects across the Carolinas and Southeast region.
Fastest Mobilization in the Mid-Atlantic
