All Projects
Highway & DOT Case Study
I-540 Triangle Expressway Southeast Extension
Raleigh, NC
Lane-Blythe JV

Segment Length
8.6 Miles
Material Used
Polyurea
Audit Pass Rate
100%
Bead System
Double-Drop
The Challenge
Applying durable, long-life markings on a brand new 8.6-mile expressway extension with numerous flyovers, ramps, and concrete bridge structures requiring high-retroreflectivity materials.
TMI Solution
Our team utilized state-of-the-art plural component spray equipment to apply heavy-duty polyurea pavement markings, utilizing double-drop reflective glass beads for optimal nighttime visibility.
Polyurea Coatings
Pavement Marking
Highway Striping
Retroreflectivity Testing
Project Outcome
The new expressway section opened safely in 2025 with clear, high-contrast, and highly durable lane markings. The installation fully complied with all NC Turnpike Authority and NCDOT standards.
Deployment Radius
TMI Services provides mobile deployment for high-scale projects across the Carolinas and Southeast region.
Fastest Mobilization in the Mid-Atlantic
